Challenge: High-Cost, Time-Intensive Pump Overhaul
Westpower was contracted to overhaul two large Leistritz twin-screw pipeline pumps. We were asked to quote 19 days x 3 technicians per shift on a 24-hour schedule based on the client’s assessment of the scope of work.
Westpower’s Solution: Expert Field Service Backed by In-House Specialists
Trained and specialized in pumps, and backed by a technical team of applications specialists, design engineers, and experts in mechanical seals, lubrication, metallurgy and vibration, Westpower team delivered. The overhaul was completed in 7 days and the invoice was less than half of the estimate, saving $167,000.
The scope of work included bearings and mechanical seal changes, replacing coupling shim packs, annual preventative maintenance, and maintenance of the lube oil and barrier fluid systems flush. Our in-house technical experts provided quick answers to keep the crew going. This included addressing critical questions during the weekend when OEM(s) are closed.
This project demonstrates the value Westpower Field Service brings as rotating equipment specialists.
Services Included in the Project
- Specialty pump overhaul expertise
- Support from in-house experts in each category, design engineer, mechanical seal engineer, lubrication engineer and metallurgist engineer
- 24/7 field crew support
- Robust supply chain for parts and components