Case Study | Westpower’s Hydraulic Re-rate & Re-engineered Pumps Optimize Performance

Case Study | Westpower’s Hydraulic Re-rate & Re-engineered Pumps Optimize Performance

7 November 2019

Westpower completed a re-rate project which involved re-rating 3 spare pumps based on the client’s new pipeline process requirements. Westpower’s drop-in replacement solution required no modifications to the client’s existing system. Our solution also enabled the client to obtain peak hydraulic efficiency, reduce energy consumption and maximize the life of their equipment.

Click to read the full case study here: Re-rate & Re-engineered Pumps

Westpower’s stringent hydraulic design practices allowed for the pumps to be supplied without factory testing, drastically reducing the project lead time and cost. Contact us to learn more about how we can help lower your total cost of ownership.